infrastructure
MINUTES

#fedora-meeting-1: Infrastructure (2020-04-30)

Meeting started by smooge at 15:00:41 UTC (full logs).

Meeting summary

    1. Agenda is at: https://board.net/p/fedora-infra (smooge, 15:00:41)
    2. About our team: https://docs.fedoraproject.org/en-US/cpe/ (smooge, 15:00:42)

  1. aloha (smooge, 15:00:43)
  2. Next chair (smooge, 15:02:42)
    1. magic eight ball says:  (smooge, 15:02:42)
    2. 2020-04-30 - smooge (smooge, 15:02:42)
    3. 2020-05-07 - cverna (smooge, 15:02:42)
    4. 2020-05-14 - siddharthvipul (smooge, 15:02:43)
    5. 2020-05-21 - ??? (smooge, 15:02:44)

  3. announcements and information (smooge, 15:03:51)
    1. CPE Sustaining EU-hours team has standups on Tuesday and Thursday at 1400 UTC in #fedora-admin - please join (smooge, 15:03:51)
    2. CPE Sustaining NA-hours team has a Monday through Friday 30 minute meeting going through tickets at 1800 UTC in #fedora-admin (smooge, 15:03:51)
    3. Fedora Infrastructure will be moving in 2020-06 from its Phoenix Az datacenter to one near Herndon Va. A lot of planning will be involved on this. Please watch out for announcements on changes. (smooge, 15:03:51)
    4. Fedora Communishift move has started but will take longer than expected. Current estimate for bringing back into production is TBD (smooge, 15:03:52)
    5. Fedora 32 is out the door! (nirik, 15:04:23)
    6. Taskotron is EOL and turned off as of today (smooge, 15:04:23)

  4. Oncall (smooge, 15:05:14)
    1. https://fedoraproject.org/wiki/Infrastructure/Oncall (smooge, 15:05:14)
    2. cverna is oncall 2020-04-23-> 2020-04-30 (smooge, 15:05:15)
    3. siddharthvipul is oncall 2020-04-30 -> 2020-05-07 (smooge, 15:05:15)
    4.   ??? is oncall 2020-05-07 -> 2020-05-14 (smooge, 15:05:15)
    5. ??? is oncall 2020-05-14 -> 2020-05-21 (smooge, 15:05:16)
    6. Summary of last week: (from current oncall ) (smooge, 15:05:52)

  5. Monitoring discussion [nirik] (smooge, 15:07:50)
    1. https://nagios.fedoraproject.org/nagios (smooge, 15:07:50)
    2. Go over existing out items and fix (smooge, 15:07:50)

  6. Open Floor (smooge, 15:18:11)
    1. RDU-CC Hosts are preliminarily wired but a switch died in transit and needs repairs. Work will be done on that Friday (smooge, 15:20:32)
    2. IAD2 initial networking routes inside of RH have been done. This means various chains of data can start to be replicated and we can begin standup of the hosts. Various steps still need to be case by case as cross networking firewalls have not been done (smooge, 15:22:32)
    3. Fedora Infra will be moving its ansible to pagure.io next week (smooge, 15:36:50)
    4. time/date to be determined (smooge, 15:36:58)


Meeting ended at 15:38:42 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. smooge (65)
  2. nirik (48)
  3. pingou (43)
  4. zodbot (28)
  5. cverna (9)
  6. mkonecny (8)
  7. sincorchetes (7)
  8. siddharthvipul (6)
  9. iamkc (3)
  10. mobrien[m] (3)
  11. amrmzaki (3)
  12. nils (2)
  13. austinpowered (1)
  14. abompard (0)
  15. mizdebsk (0)


Generated by MeetBot 0.1.4.